Everything outstanding, in build order. Tick items off here or on any tab — the same item stays in sync everywhere.
Kitchen fit-out in order. Step 1 gates everything; pantry wiring gates Lee's sign-off.
Gas, water, drainage and heating connections. Kitchen items follow Ian's worktop fit.
Lee has confirmed Ian can arrange the remaining wiring. His sign-off waits on the pantry wiring being in.
Not yet appointed — these are the packages out for quotes (see the schedule of works document).
Our decisions and purchases — most of these block someone else, so this tab clears first.